ITAC Assessment: SD0605
ITAC logo
ITAC Assessment: SD0605
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Aircraft Equipment and Parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 391
Plant Area 115,600
ft2
Annual Production 17,000
units
Production Hrs. Annual 4,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,745 5,438,808
kWh
Electricity Demand $105,554 6,152
kW-mo/yr
Electricity Fees $10,120 -
TOTAL YEARLY COSTS $410,419
RECOMMENDED SAVINGS* $10,804 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $804

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,289 - $1,289
23,785
kWh
- -
02 2.4133: Use most efficient type of electric motors $2,006 $2,850 $1,059
19,533
kWh
$947
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,962 $5,000 $1,035
19,100
kWh
$927
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,760 $1,855 $883
16,300
kWh
$877
-
kW-mo/yr
-
05 2.2625: Chill water to the highest temperature possible $2,344 $100 $817
15,078
kWh
$1,527
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $804 $1,696 $407
7,490
kWh
$364
-
kW-mo/yr
$33
07 2.4133: Use most efficient type of electric motors $639 $2,000 $337
6,218
kWh
$302
-
kW-mo/yr
-
TOTAL RECOMMENDED $10,804 $13,501 $5,827
107,504
kWh
$4,943
-
kW-mo/yr
$33
TOTAL IMPLEMENTED $804 $1,696 $407
7,490
kWh
$364
-
kW-mo/yr
$33
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs