ITAC Assessment: SD0542
ITAC logo
ITAC Assessment: SD0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Store Fixtures
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $10
M
to 50
M
# of Employees 153
Plant Area 260,000
ft2
Annual Production 15,000
units
Production Hrs. Annual 4,940
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,840 1,264,026
kWh
Electricity Demand $156,421 10,796
kW-mo/yr
Electricity Fees $(-107,254.0) -
TOTAL YEARLY COSTS $189,007
RECOMMENDED SAVINGS* $49,917 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,705

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,070 $9,000 $17,070
154,342
kWh
-
02 2.7232: Replace existing hvac unit with high efficiency model $11,069 $31,000 $8,355
75,541
kWh
$2,714
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,743 $11,288 $6,063
54,827
kWh
$680
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,078 $14,300 $5,078
45,917
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,740 $1,500 $3,740
33,818
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,162 $600 $2,162
19,546
kWh
-
07 2.4234: Cool compressor air intake with heat exchanger $1,935 $1,833 $1,935
17,495
kWh
-
08 2.4133: Use most efficient type of electric motors $1,153 $2,288 $870
7,870
kWh
$283
-
kW-mo/yr
09 2.4239: Eliminate or reduce compressed air usage $967 $850 $967
8,745
kWh
-
TOTAL RECOMMENDED $49,917 $72,659 $46,240
418,101
kWh
$3,677
-
kW-mo/yr
TOTAL IMPLEMENTED $22,705 $46,076 $19,028
172,056
kWh
$3,677
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs