ITAC Assessment: SD0530
ITAC logo
ITAC Assessment: SD0530
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Eye Care Components
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $100
M
to 500
M
# of Employees 750
Plant Area 210,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $394,504 4,989,359
kWh
Electricity Demand $263,414 10,165
kW-mo/yr
Electricity Fees $30,592 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,202

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4131: Size electric motors for peak operating efficiency $14,594 $36,400 $10,132
128,088
kWh
$4,462
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,344 $1,500 $1,194
15,096
kWh
$1,150
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,876 $200 $1,876
23,720
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $1,261 $861 $642
8,111
kWh
$619
-
kW-mo/yr
05 2.7145: Install skylights $1,125 $3,360 $573
7,246
kWh
$552
-
kW-mo/yr
06 2.7134: Use photocell controls $1,002 $2,590 $914
11,556
kWh
$88
-
kW-mo/yr
TOTAL RECOMMENDED $22,202 $44,911 $15,331
193,817
kWh
$6,871
-
kW-mo/yr
TOTAL IMPLEMENTED $22,202 $44,911 $15,331
193,817
kWh
$6,871
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs