ITAC Assessment: SD0512
ITAC logo
ITAC Assessment: SD0512
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Industrial Valves
NAICS 332911: Industrial Valve Manufacturing
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 110,000
ft2
Annual Production 320
pieces
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,856 1,567,781
kWh
Electricity Demand $84,545 4,833
kW-mo/yr
Electricity Fees $7,413 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,761 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,623

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $34,138 $61,820 $8,716
113,058
kWh
$29,278
-
kW-mo/yr
- $(-3,856.0)
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $39,697 $25,608 - - $39,697 -
03 2.7232: Replace existing hvac unit with high efficiency model $9,185 $45,900 $6,224
80,727
kWh
$2,961
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,532 $800 $5,623
72,936
kWh
$909
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $3,224 $2,850 $3,224
41,769
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,985 $5,247 $1,811
23,488
kWh
$1,174
-
kW-mo/yr
- -
TOTAL RECOMMENDED $95,761 $142,225 $25,598
331,978
kWh
$34,322
-
kW-mo/yr
$39,697 $(-3,856.0)
-
MMBtu
TOTAL IMPLEMENTED $61,623 $80,405 $16,882
218,920
kWh
$5,044
-
kW-mo/yr
$39,697 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs