ITAC Assessment: SD0422
ITAC logo
ITAC Assessment: SD0422
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product AIRCRAFT FASTENERS
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 160
Plant Area 75,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,426
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,130 3,075,657
kWh
Electricity Demand $159,339 8,522
kW-mo/yr
Electricity Fees $12,647 -
Natural Gas $25,627 2,801
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,124 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,359

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $31,588 - - $31,588
-
kW-mo/yr
02 2.3132: Recharge batteries on during off-peak demand periods $5,480 - - $5,480
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,840 $2,200 $6,840
84,460
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,765 $2,554 $1,903
23,499
kWh
$862
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,451 $4,146 $2,451
30,264
kWh
-
TOTAL RECOMMENDED $49,124 $8,900 $11,194
138,223
kWh
$37,930
-
kW-mo/yr
TOTAL IMPLEMENTED $46,359 $6,346 $9,291
114,724
kWh
$37,068
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs