Assessment Year | 2007 |
---|---|
Principal Product | Precision Sheet Metal Manufacturing |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
7,300
ft2
|
Annual Production | 30,000
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $85,641 | 913,920 |
kWh
|
$0.094 |
Electricity Demand | $45,827 | 3,175 |
kW-mo/yr
|
$14.43 |
Electricity Fees | $6,746 | - |
|
- |
Natural Gas | $32,725 | 3,467 |
MMBtu
|
$9.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,587 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,121 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,030 | $45,224 |
$16,325
174,222
kWh
|
$6,705
-
kW-mo/yr
|
- | |
02 | 2.7145: Install skylights | $4,253 | $13,615 |
$3,012
32,140
kWh
|
$1,241
-
kW-mo/yr
|
- | |
03 | 2.2135: Repair and eliminate steam leaks | $2,091 | $150 |
$1,482
15,816
kWh
|
$609
-
kW-mo/yr
|
- | |
04 | 2.2442: Preheat combustion air with waste heat | $1,860 | $5,101 | - | - |
$1,860
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,353 | $2,193 |
$1,353
14,439
kWh
|
- | - | |
TOTAL RECOMMENDED | $32,587 | $66,283 |
$22,172
236,617
kWh
|
$8,555
-
kW-mo/yr
|
$1,860
-
MMBtu
|
||
TOTAL IMPLEMENTED | $25,121 | $45,374 |
$17,807
190,038
kWh
|
$7,314
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs