ITAC Assessment: SD0398
ITAC logo
ITAC Assessment: SD0398
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Precision Sheet Metal Manufacturing
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 7,300
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,641 913,920
kWh
Electricity Demand $45,827 3,175
kW-mo/yr
Electricity Fees $6,746 -
Natural Gas $32,725 3,467
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,587 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,121

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,030 $45,224 $16,325
174,222
kWh
$6,705
-
kW-mo/yr
-
02 2.7145: Install skylights $4,253 $13,615 $3,012
32,140
kWh
$1,241
-
kW-mo/yr
-
03 2.2135: Repair and eliminate steam leaks $2,091 $150 $1,482
15,816
kWh
$609
-
kW-mo/yr
-
04 2.2442: Preheat combustion air with waste heat $1,860 $5,101 - - $1,860
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,353 $2,193 $1,353
14,439
kWh
- -
TOTAL RECOMMENDED $32,587 $66,283 $22,172
236,617
kWh
$8,555
-
kW-mo/yr
$1,860
-
MMBtu
TOTAL IMPLEMENTED $25,121 $45,374 $17,807
190,038
kWh
$7,314
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs