ITAC Assessment: SD0376
ITAC logo
ITAC Assessment: SD0376
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product o-rings
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 153,000
ft2
Annual Production 250,000,000
pieces
Production Hrs. Annual 5,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $407,204 5,997,773
kWh
Electricity Demand $204,998 15,428
kW-mo/yr
Electricity Fees $36,712 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,537 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,109

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $46,522 $143,750 $37,304
549,395
kWh
$31,856
-
kW-mo/yr
$(-22,638.0)
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,390 $43,125 $24,390
359,209
kWh
- -
03 2.2626: Avoid frost formation on evaporators $16,408 $31,225 $12,939
190,565
kWh
$3,469
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,062 $31,291 $9,717
143,105
kWh
$4,345
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,642 - $8,041
118,435
kWh
$3,601
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,516 $12,616 $5,516
81,240
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $997 $502 $997
14,687
kWh
- -
TOTAL RECOMMENDED $119,537 $262,509 $98,904
1,456,636
kWh
$43,271
-
kW-mo/yr
$(-22,638.0)
-
MMBtu
TOTAL IMPLEMENTED $43,109 $63,018 $31,694
466,792
kWh
$11,415
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs