ITAC Assessment: SD0303
ITAC logo
ITAC Assessment: SD0303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Manufactured homes
NAICS
n/a
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 460
Plant Area 200,000
ft2
Annual Production 1,200
pieces
Production Hrs. Annual 2,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,306 1,355,878
kWh
Electricity Demand $46,532 5,615
kW-mo/yr
Electricity Fees $722 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,133

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7111: Reduce illumination to minimum necessary levels $17,018 $30,684 $12,849
110,015
kWh
$4,169
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,991 $1,642 $7,849
67,199
kWh
$3,142
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,435 $19,000 $7,451
63,795
kWh
$2,984
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,336 $6,324 $4,029
34,499
kWh
$1,307
-
kW-mo/yr
-
05 4.611: Begin a practice of predictive / preventative maintenance $3,133 $500 $2,238
19,162
kWh
$895
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $1,457 $1,800 $1,457
12,474
kWh
- -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $3,620 $6,000 - - $3,620
-
lb
TOTAL RECOMMENDED $51,990 $65,950 $35,873
307,144
kWh
$12,497
-
kW-mo/yr
$3,620
-
lb
TOTAL IMPLEMENTED $3,133 $500 $2,238
19,162
kWh
$895
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs