| Assessment Year | 2002 |
|---|---|
| Principal Product | Manufactured homes |
| NAICS |
n/a
|
| SIC | 2452: Prefabricated Wood Buildings and Components |
| Sales Range | $50 M to 100M |
| # of Employees | 460 |
| Plant Area |
200,000
ft2
|
| Annual Production | 1,200
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $158,306 | 1,355,878 |
kWh
|
$0.12 |
| Electricity Demand | $46,532 | 5,615 |
kW-mo/yr
|
$8.29 |
| Electricity Fees | $722 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,990 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,133 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $17,018 | $30,684 |
$12,849
110,015
kWh
|
$4,169
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,991 | $1,642 |
$7,849
67,199
kWh
|
$3,142
-
kW-mo/yr
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,435 | $19,000 |
$7,451
63,795
kWh
|
$2,984
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,336 | $6,324 |
$4,029
34,499
kWh
|
$1,307
-
kW-mo/yr
|
- | |
| 05 | 4.611: Begin a practice of predictive / preventative maintenance | $3,133 | $500 |
$2,238
19,162
kWh
|
$895
-
kW-mo/yr
|
- | |
| 06 | 2.7135: Install occupancy sensors | $1,457 | $1,800 |
$1,457
12,474
kWh
|
- | - | |
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $3,620 | $6,000 | - | - |
$3,620
-
lb
|
|
| TOTAL RECOMMENDED | $51,990 | $65,950 |
$35,873
307,144
kWh
|
$12,497
-
kW-mo/yr
|
$3,620
-
lb
|
||
| TOTAL IMPLEMENTED | $3,133 | $500 |
$2,238
19,162
kWh
|
$895
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs