| Assessment Year | 2000 |
|---|---|
| Principal Product | aluminum extrusion for automobile industry |
| NAICS |
n/a
|
| SIC | 3354: Aluminum Extruded Products |
| Sales Range | $50 M to 100M |
| # of Employees | 275 |
| Plant Area |
166,000
ft2
|
| Annual Production | 25,000
ton
|
| Production Hrs. Annual | 6,120
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $770,297 | 17,065,065 |
kWh
|
$0.045 |
| Electricity Demand | $303,661 | 29,561 |
kW-mo/yr
|
$10.27 |
| Electricity Fees | $3,588 | - |
|
- |
| Natural Gas | $1,366,819 | 411,809 |
MMBtu
|
$3.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $521,907 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $313,479 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7145: Install skylights | $18,038 | $27,000 |
$7,259
160,610
kWh
|
$10,779
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,703 | $7,230 |
$3,967
87,925
kWh
|
$736
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $205,696 | $64,500 | - | - |
$205,696
-
MMBtu
|
- | - | |
| 04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,732 | $5,400 | - | - | - |
$2,732
-
lb
|
- | |
| 05 | 2.8114: Change rate schedules or other changes in utility service | $290,738 | - | - | - | - | - | $290,738 | |
| TOTAL RECOMMENDED | $521,907 | $104,130 |
$11,226
248,535
kWh
|
$11,515
-
kW-mo/yr
|
$205,696
-
MMBtu
|
$2,732
-
lb
|
$290,738 | ||
| TOTAL IMPLEMENTED | $313,479 | $34,230 |
$11,226
248,535
kWh
|
$11,515
-
kW-mo/yr
|
- | - | $290,738 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs