ITAC Assessment: SD0256
ITAC logo
ITAC Assessment: SD0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product aluminum extrusion for automobile industry
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $50
M
to 100
M
# of Employees 275
Plant Area 166,000
ft2
Annual Production 25,000
ton
Production Hrs. Annual 6,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $770,297 17,065,065
kWh
Electricity Demand $303,661 29,561
kW-mo/yr
Electricity Fees $3,588 -
Natural Gas $1,366,819 411,809
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $521,907 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $313,479

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7145: Install skylights $18,038 $27,000 $7,259
160,610
kWh
$10,779
-
kW-mo/yr
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,703 $7,230 $3,967
87,925
kWh
$736
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $205,696 $64,500 - - $205,696
-
MMBtu
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,732 $5,400 - - - $2,732
-
lb
-
05 2.8114: Change rate schedules or other changes in utility service $290,738 - - - - - $290,738
TOTAL RECOMMENDED $521,907 $104,130 $11,226
248,535
kWh
$11,515
-
kW-mo/yr
$205,696
-
MMBtu
$2,732
-
lb
$290,738
TOTAL IMPLEMENTED $313,479 $34,230 $11,226
248,535
kWh
$11,515
-
kW-mo/yr
- - $290,738
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs