ITAC Assessment: SD0215
ITAC logo
ITAC Assessment: SD0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Heat sinks and golf club inserts
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 205
Plant Area 30,000
ft2
Annual Production 130,000
lb
Production Hrs. Annual 7,956
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,568 3,084,994
kWh
Electricity Demand $54,590 5,295
kW-mo/yr
Electricity Fees $6,212 -
Natural Gas $3,332 436
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $536,775 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,635

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7144: Install spectral reflectors / delamp $3,652 $3,480 $2,169
64,771
kWh
$1,483
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,635 $6,257 $1,585
47,186
kWh
$1,050
-
kW-mo/yr
- - -
03 2.2511: Insulate bare equipment $1,080 $906 $1,080
32,239
kWh
- - - -
04 2.7314: Reduce ventilation air $2,763 $1,600 $1,795
53,341
kWh
$968
-
kW-mo/yr
- - -
05 3.6112: Use filter and drying oven to reduce sludge volume $1,153 $3,000 - - - $1,153
-
lb
-
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,300 $7,000 - - - $5,300
-
lb
-
07 3.8132: Use less toxic and volatile solvent substitutes $13,012 - - - $13,012
-
gal
- -
08 4.112: Replace old machine with new automatic multi-station tool $507,180 $5,000 - - - - $507,180
TOTAL RECOMMENDED $536,775 $27,243 $6,629
197,537
kWh
$3,501
-
kW-mo/yr
$13,012
-
gal
$6,453
-
lb
$507,180
TOTAL IMPLEMENTED $2,635 $6,257 $1,585
47,186
kWh
$1,050
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs