ITAC Assessment: SD0115
ITAC logo
ITAC Assessment: SD0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Cncrete and Steel Pipes
NAICS
n/a
SIC 3275: Gypsum Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 116,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $344,782 3,736,225
kWh
Natural Gas $138,724 52,081
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $16,656 $15,430 $16,656
180,539
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,434 $1,200 $16,434
177,608
kWh
-
03 2.2135: Repair and eliminate steam leaks $3,100 $2,475 - $3,100
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,259 $6,568 $6,259
68,288
kWh
-
05 2.7144: Install spectral reflectors / delamp $3,631 $4,780 $3,631
36,928
kWh
-
06 2.7134: Use photocell controls $6,183 $1,150 $6,183
63,892
kWh
-
TOTAL RECOMMENDED $52,263 $31,603 $49,163
527,255
kWh
$3,100
-
MMBtu
TOTAL IMPLEMENTED $46,080 $30,453 $42,980
463,363
kWh
$3,100
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs