ITAC Assessment: SD0093
ITAC logo
ITAC Assessment: SD0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Plastic Molded Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 16
Plant Area 13,000
ft2
Annual Production 225,000
lb
Production Hrs. Annual 2,168
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,224 309,203
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,471

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $638 $940 $638
4,689
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $220 $45 $220
1,758
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $299 $200 $299
2,345
kWh
04 2.2511: Insulate bare equipment $7,742 $1,684 $7,742
56,858
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,397 $1,089 $1,397
12,309
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $917 $1,435 $917
7,327
kWh
TOTAL RECOMMENDED $11,213 $5,393 $11,213
85,286
kWh
TOTAL IMPLEMENTED $3,471 $3,709 $3,471
28,428
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs