ITAC Assessment: PV0001
ITAC logo
ITAC Assessment: PV0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PRESSURE VESSEL FABRICAT
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 8,568
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,395 997,655
kWh
Natural Gas $152,086 26,141
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1131: Repair faulty insulation in furnaces, boilers, etc $3,125 $1,659 - $3,125
-
MMBtu
02 2.4133: Use most efficient type of electric motors $499 $666 $499
6,448
kWh
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,276 $1,271 $3,276
45,428
kWh
-
TOTAL RECOMMENDED $6,900 $3,596 $3,775
51,876
kWh
$3,125
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs