Assessment Year | 1999 |
---|---|
Principal Product | Seafood products |
NAICS |
n/a
|
SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
Sales Range | $10 M to 50M |
# of Employees | 226 |
Plant Area |
65,000
ft2
|
Annual Production | 14,500,000
lb
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Alaska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $496,165 | 3,828,546 |
kWh
|
$0.13 |
Electricity Demand | $83,421 | 176,556 |
kW-mo/yr
|
$0.47 |
Electricity Fees | $2,880 | - |
|
- |
LPG | $18,344 | 597 |
MMBtu
|
$30.73 |
Fuel Oil #2 | $94,417 | 16,407 |
MMBtu
|
$5.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $544,609 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $170,549 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $366,525 | $729,500 |
$496,165
3,828,546
kWh
|
$83,421
-
kW-mo/yr
|
$2,880 | - |
$(-215,941.0)
-
MMBtu
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $9,492 | $7,459 |
$8,233
63,599
kWh
|
$1,259
-
kW-mo/yr
|
- | - | - | - | - | - | |
03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $39,677 | $20,000 |
$39,677
306,272
kWh
|
- | - | - | - | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,755 | $20,400 |
$7,755
59,789
kWh
|
- | - | - | - | - | - | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,140 | $700 | - | - | - | - |
$2,140
-
MMBtu
|
- | - | - | |
06 | 2.2121: Increase amount of condensate returned | $1,420 | $2,000 | - | - | - | - |
$1,420
-
MMBtu
|
- | - | - | |
07 | 3.4151: Minimize water usage | $(-1,640.0) | $4,000 |
$(-1,640.0)
(-12,603)
kWh
|
- | - | - | - | - | - | - | |
08 | 3.3133: Use other waste concentration methods | $39,020 | $34,600 |
$(-6,850.0)
(-53,048)
kWh
|
- | - | - | - |
$49,300
-
lb
|
$(-930.0) | $(-2,500.0) | |
09 | 4.445: Install equipment to move product | $80,220 | $15,400 |
$(-480.0)
(-3,810)
kWh
|
- | - |
$3,100
-
MMBtu
|
- | - | $77,600 | - | |
TOTAL RECOMMENDED | $544,609 | $834,059 |
$542,860
4,188,745
kWh
|
$84,680
-
kW-mo/yr
|
$2,880 |
$3,100
-
MMBtu
|
$(-212,381.0)
-
MMBtu
|
$49,300
-
lb
|
$76,670 | $(-2,500.0) | ||
TOTAL IMPLEMENTED | $170,549 | $78,159 |
$40,580
313,013
kWh
|
$1,259
-
kW-mo/yr
|
- |
$3,100
-
MMBtu
|
$2,140
-
MMBtu
|
$49,300
-
lb
|
$76,670 | $(-2,500.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs