ITAC Assessment: ORS003
ITAC logo
ITAC Assessment: ORS003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Seafood products
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 226
Plant Area 65,000
ft2
Annual Production 14,500,000
lb
Production Hrs. Annual 4,680
hrs
Location (State) Alaska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $496,165 3,828,546
kWh
Electricity Demand $83,421 176,556
kW-mo/yr
Electricity Fees $2,880 -
LPG $18,344 597
MMBtu
Fuel Oil #2 $94,417 16,407
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $544,609 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $170,549

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $366,525 $729,500 $496,165
3,828,546
kWh
$83,421
-
kW-mo/yr
$2,880 - $(-215,941.0)
-
MMBtu
- - -
02 2.4133: Use most efficient type of electric motors $9,492 $7,459 $8,233
63,599
kWh
$1,259
-
kW-mo/yr
- - - - - -
03 2.2621: Modify refrigeration system to operate at a lower pressure $39,677 $20,000 $39,677
306,272
kWh
- - - - - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,755 $20,400 $7,755
59,789
kWh
- - - - - - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,140 $700 - - - - $2,140
-
MMBtu
- - -
06 2.2121: Increase amount of condensate returned $1,420 $2,000 - - - - $1,420
-
MMBtu
- - -
07 3.4151: Minimize water usage $(-1,640.0) $4,000 $(-1,640.0)
(-12,603)
kWh
- - - - - - -
08 3.3133: Use other waste concentration methods $39,020 $34,600 $(-6,850.0)
(-53,048)
kWh
- - - - $49,300
-
lb
$(-930.0) $(-2,500.0)
09 4.445: Install equipment to move product $80,220 $15,400 $(-480.0)
(-3,810)
kWh
- - $3,100
-
MMBtu
- - $77,600 -
TOTAL RECOMMENDED $544,609 $834,059 $542,860
4,188,745
kWh
$84,680
-
kW-mo/yr
$2,880 $3,100
-
MMBtu
$(-212,381.0)
-
MMBtu
$49,300
-
lb
$76,670 $(-2,500.0)
TOTAL IMPLEMENTED $170,549 $78,159 $40,580
313,013
kWh
$1,259
-
kW-mo/yr
- $3,100
-
MMBtu
$2,140
-
MMBtu
$49,300
-
lb
$76,670 $(-2,500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs