ITAC Assessment: ORC024
ITAC logo
ITAC Assessment: ORC024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product education
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 1
Plant Area 138,762
ft2
Annual Production 1
units
Production Hrs. Annual 3,120
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,086 2,253,000
kWh
Electricity Demand $92,753 5,427
kW-mo/yr
Electricity Fees $49,681 -
Natural Gas $4,260 374
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $261,781
RECOMMENDED SAVINGS* $28,184 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $12,770 $36,078 $6,923
135,519
kWh
$5,591
-
kW-mo/yr
$256
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,320 $59,060 $5,771
112,978
kWh
$5,549
-
kW-mo/yr
-
03 2.7423: Reduce heat gain by window tinting $1,110 $2,717 $1,110
21,733
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $1,828 - $1,828
35,793
kWh
- -
05 2.7314: Reduce ventilation air $1,156 $325 $803
15,725
kWh
- $353
-
MMBtu
TOTAL RECOMMENDED $28,184 $98,180 $16,435
321,748
kWh
$11,140
-
kW-mo/yr
$609
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs