ITAC Assessment: ORC013
ITAC logo
ITAC Assessment: ORC013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Education
NAICS 611210: Junior Colleges
SIC 8222: Junior Colleges and Technical Institutes
Sales Range less than $500
k
# of Employees 30
Plant Area 100,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 3,380
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,812 230,200
kWh
Electricity Demand $302 45
kW-mo/yr
Natural Gas $47,833 7,359
MMBtu
TOTAL YEARLY COSTS $61,947
RECOMMENDED SAVINGS* $42,996 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,643 $49,125 $5,463
91,044
kWh
$180
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $559 $1,200 $559
9,318
kWh
- -
03 2.7224: Reduce space conditioning during non-working hours $9,215 $1,500 $407
6,790
kWh
- $8,808
-
MMBtu
04 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $27,579 $200,000 $539
8,990
kWh
- $27,040
-
MMBtu
TOTAL RECOMMENDED $42,996 $251,825 $6,968
116,142
kWh
$180
-
kW-mo/yr
$35,848
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs