ITAC Assessment: OR0820
ITAC logo
ITAC Assessment: OR0820
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 5
Plant Area 154,000
ft2
Annual Production 140,000
ton
Production Hrs. Annual 2,025
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,078 1,291,611
kWh
Electricity Demand $110,454 6,099
kW-mo/yr
Electricity Fees $12,244 -
Natural Gas $133,496 45,635
MMBtu
TOTAL YEARLY COSTS $340,272
RECOMMENDED SAVINGS* $29,881 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,825 - $1,714
26,328
kWh
$9,111
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,677 $982 $1,766
27,129
kWh
$2,911
-
kW-mo/yr
-
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $2,066 $629 $2,066
31,734
kWh
- -
04 2.5121: Redesign flow to minimize mass transfer length $12,313 $87,500 $762
11,707
kWh
$4,051
-
kW-mo/yr
$7,500
TOTAL RECOMMENDED $29,881 $89,111 $6,308
96,898
kWh
$16,073
-
kW-mo/yr
$7,500
TOTAL IMPLEMENTED - - - - -