| Assessment Year | 2025 |
|---|---|
| Principal Product | Asphalt |
| NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | $5 M to 10M |
| # of Employees | 5 |
| Plant Area |
154,000
ft2
|
| Annual Production | 140,000
ton
|
| Production Hrs. Annual | 2,025
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $84,078 | 1,291,611 |
kWh
|
$0.065 |
| Electricity Demand | $110,454 | 6,099 |
kW-mo/yr
|
$18.11 |
| Electricity Fees | $12,244 | - |
|
- |
| Natural Gas | $133,496 | 45,635 |
MMBtu
|
$2.93 |
| TOTAL YEARLY COSTS | $340,272 | |||
| RECOMMENDED SAVINGS* | $29,881 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,825 | - |
$1,714
26,328
kWh
|
$9,111
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,677 | $982 |
$1,766
27,129
kWh
|
$2,911
-
kW-mo/yr
|
- | |
| 03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $2,066 | $629 |
$2,066
31,734
kWh
|
- | - | |
| 04 | 2.5121: Redesign flow to minimize mass transfer length | $12,313 | $87,500 |
$762
11,707
kWh
|
$4,051
-
kW-mo/yr
|
$7,500 | |
| TOTAL RECOMMENDED | $29,881 | $89,111 |
$6,308
96,898
kWh
|
$16,073
-
kW-mo/yr
|
$7,500 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs