ITAC Assessment: OR0749
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Shiitake Mycelium Blocks
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 37
Plant Area 85,000
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,837 2,177,800
kWh
Electricity Demand $29,475 4,349
kW-mo/yr
Electricity Fees $8,598 -
LPG $127,317 8,319
MMBtu
TOTAL YEARLY COSTS $294,227
RECOMMENDED SAVINGS* $169,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $126,102

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $999 - $866
13,886
kWh
$133
-
kW-mo/yr
-
02 2.1321: Replace fossil fuel equipment with electrical equipment $43,522 $28,094 $(-21,648.0)
(-347,592)
kWh
$(-6,551.0)
-
kW-mo/yr
$71,721
-
MMBtu
03 2.2441: Preheat boiler makeup water with waste process heat $3,003 $11,329 - - $3,003
-
MMBtu
04 2.1224: Replace boiler $122,100 $1,640,000 - - $122,100
-
MMBtu
TOTAL RECOMMENDED $169,624 $1,679,423 $(-20,782.0)
(-333,706)
kWh
$(-6,418.0)
-
kW-mo/yr
$196,824
-
MMBtu
TOTAL IMPLEMENTED $126,102 $1,651,329 $866
13,886
kWh
$133
-
kW-mo/yr
$125,103
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs