Assessment Year | 2022 |
---|---|
Principal Product | Shiitake Mycelium Blocks |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 37 |
Plant Area |
85,000
ft2
|
Annual Production | 1,500,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $128,837 | 2,177,800 |
kWh
|
$0.059 |
Electricity Demand | $29,475 | 4,349 |
kW-mo/yr
|
$6.78 |
Electricity Fees | $8,598 | - |
|
- |
LPG | $127,317 | 8,319 |
MMBtu
|
$15.30 |
TOTAL YEARLY COSTS | $294,227 | |||
RECOMMENDED SAVINGS* | $169,624 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $126,102 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $999 | - |
$866
13,886
kWh
|
$133
-
kW-mo/yr
|
- | |
02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $43,522 | $28,094 |
$(-21,648.0)
(-347,592)
kWh
|
$(-6,551.0)
-
kW-mo/yr
|
$71,721
-
MMBtu
|
|
03 | 2.2441: Preheat boiler makeup water with waste process heat | $3,003 | $11,329 | - | - |
$3,003
-
MMBtu
|
|
04 | 2.1224: Replace boiler | $122,100 | $1,640,000 | - | - |
$122,100
-
MMBtu
|
|
TOTAL RECOMMENDED | $169,624 | $1,679,423 |
$(-20,782.0)
(-333,706)
kWh
|
$(-6,418.0)
-
kW-mo/yr
|
$196,824
-
MMBtu
|
||
TOTAL IMPLEMENTED | $126,102 | $1,651,329 |
$866
13,886
kWh
|
$133
-
kW-mo/yr
|
$125,103
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs