ITAC Assessment: OR0720
ITAC logo
ITAC Assessment: OR0720
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Packed Apples
NAICS 111331: Apple Orchards
SIC 0175: Deciduous Tree Fruits
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 183,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,461 10,860,340
kWh
TOTAL YEARLY COSTS $185,461
RECOMMENDED SAVINGS* $68,101 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,763

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 3.3128: Utilize other methods to remove contaminants $27,061 $33,855 $(-1,615.0)
(-65,323)
kWh
- - $29,000 $(-324.0)
02 2.3212: Optimize plant power factor $31,433 $68,000 - - $31,433 - -
03 2.2621: Modify refrigeration system to operate at a lower pressure $4,330 $1,100 $3,947
159,649
kWh
$383
-
kW-mo/yr
- - -
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $3,139 $2,013 $2,539
102,796
kWh
$600
-
kW-mo/yr
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,138 $3,275 $1,949
78,849
kWh
$189
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $68,101 $108,243 $6,820
275,971
kWh
$1,172
-
kW-mo/yr
$31,433 $29,000 $(-324.0)
TOTAL IMPLEMENTED $35,763 $69,100 $3,947
159,649
kWh
$383
-
kW-mo/yr
$31,433 - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs