ITAC Assessment: OR0719
ITAC logo
ITAC Assessment: OR0719
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Polystyrene Foam
NAICS 326140: Polystyrene Foam Product Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 310,000
ft2
Annual Production 801,000
units
Production Hrs. Annual 5,400
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,595 11,725,492
kWh
Electricity Demand $78,143 21,960
kW-mo/yr
Electricity Fees $14,741 -
TOTAL YEARLY COSTS $242,479
RECOMMENDED SAVINGS* $19,670 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.6218: Turn off equipment when not in use $8,576 $12,018 $8,576
672,656
kWh
- -
02 2.3212: Optimize plant power factor $7,063 $6,896 - - $7,063
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $4,031 $9,861 $2,579
202,256
kWh
$1,452
-
kW-mo/yr
-
TOTAL RECOMMENDED $19,670 $28,775 $11,155
874,912
kWh
$1,452
-
kW-mo/yr
$7,063
TOTAL IMPLEMENTED $19,670 $28,775 $11,155
874,912
kWh
$1,452
-
kW-mo/yr
$7,063
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs