ITAC Assessment: OR0637
ITAC logo
ITAC Assessment: OR0637
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 5
Plant Area 544,500
ft2
Annual Production 912,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,249 1,609,840
kWh
Electricity Demand $25,850 4,033
kW-mo/yr
Electricity Fees $9,301 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,883 $750 $11,883
217,919
kWh
- -
02 2.4131: Size electric motors for peak operating efficiency $9,404 $10,529 $9,404
173,623
kWh
- -
03 2.4133: Use most efficient type of electric motors $2,677 $1,971 $2,408
44,166
kWh
$597
-
kW-mo/yr
$(-328.0)
TOTAL RECOMMENDED $23,964 $13,250 $23,695
435,708
kWh
$597
-
kW-mo/yr
$(-328.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs