Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $100
M
to 500
M
# of Employees 135
Plant Area 91,000
ft2
Annual Production 6,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $964,549 15,292,580
kWh
Electricity Demand $162,883 32,582
kW-mo/yr
Electricity Fees $85,777 -
Natural Gas $785,883 189,171
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,940,605 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,377,107

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 4.631: Install an uninteruptable power supply $393,360 $20,880 - - - - $393,360 - -
02 2.4322: Use or replace with energy efficient substitutes $163,282 $119,416 $101,413
1,570,108
kWh
$16,869
-
kW-mo/yr
- - $45,000 - -
03 2.9141: Install anaerobic digester $1,369,423 $3,468,069 - - $37,288
-
MMBtu
$53,866
-
lb
- $(-14,192.0) $1,292,461
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,684 $7,360 $5,868
90,855
kWh
- - - $978 $838 -
05 2.1123: Install automatic stack damper $3,989 $5,325 $3,989
61,766
kWh
- - - - - -
06 2.2511: Insulate bare equipment $2,867 $2,708 - - $2,867
-
MMBtu
- - - -
TOTAL RECOMMENDED $1,940,605 $3,623,758 $111,270
1,722,729
kWh
$16,869
-
kW-mo/yr
$40,155
-
MMBtu
$53,866
-
lb
$439,338 $(-13,354.0) $1,292,461
TOTAL IMPLEMENTED $1,377,107 $3,475,429 $5,868
90,855
kWh
- $37,288
-
MMBtu
$53,866
-
lb
$978 $(-13,354.0) $1,292,461
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs