ITAC Assessment: OR0553
ITAC logo
ITAC Assessment: OR0553
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Treated wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 26
Plant Area 1,306,800
ft2
Annual Production 5,694,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,500 4,724,280
kWh
Electricity Demand $36,401 9,630
kW-mo/yr
Electricity Fees $37,784 -
Natural Gas $24 1,863
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,059

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $30,000 $81,700 $27,000
565,400
kWh
$3,000
-
kW-mo/yr
- -
02 2.4322: Use or replace with energy efficient substitutes $15,352 $35,800 $13,812
289,080
kWh
$1,540
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $8,055 $6,600 $5,515
115,457
kWh
$185
-
kW-mo/yr
$721 $1,634
04 2.4133: Use most efficient type of electric motors $2,652 $4,300 $2,381
49,835
kWh
$271
-
kW-mo/yr
- -
TOTAL RECOMMENDED $56,059 $128,400 $48,708
1,019,772
kWh
$4,996
-
kW-mo/yr
$721 $1,634
TOTAL IMPLEMENTED $56,059 $128,400 $48,708
1,019,772
kWh
$4,996
-
kW-mo/yr
$721 $1,634
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs