Assessment Year | 2004 |
---|---|
Principal Product | Frozen Foods |
NAICS | 424420: Packaged Frozen Food Merchant Wholesalers |
SIC | 5142: Packaged Frozen Foods |
Sales Range | $100 M to 500M |
# of Employees | 280 |
Plant Area |
225,000
ft2
|
Annual Production | 400,000,000
lb
|
Production Hrs. Annual | 5,376
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $705,221 | 47,014,720 |
kWh
|
$0.015 |
Electricity Demand | $461,601 | 115,604 |
kW-mo/yr
|
$3.99 |
Electricity Fees | $146,111 | - |
|
- |
Natural Gas | $518,339 | 912,754 |
MMBtu
|
$0.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $434,381 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $123,966 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $240,000 | $250,000 | - | - | - | - | - | $240,000 | |
02 | 2.3212: Optimize plant power factor | $34,000 | $34,000 | - | - | $34,000 | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $28,455 | $11,500 | - | - | - |
$28,455
-
MMBtu
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $18,900 | $3,100 |
$12,600
641,900
kWh
|
$6,300
-
kW-mo/yr
|
- | - | - | - | |
05 | 3.7211: Modify material application methods | $14,995 | $1,875 | - | - | - |
$12,570
-
MMBtu
|
$2,425
-
Tgal
|
- | |
06 | 3.5311: Recover and reuse waste material | $13,416 | $25,000 | - | - | - | - |
$13,416
-
Tgal
|
- | |
07 | 2.2622: Replace existing chiller with high efficiency model | $29,545 | $182,000 |
$28,645
1,909,680
kWh
|
$900
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.2621: Modify refrigeration system to operate at a lower pressure | $48,200 | - |
$48,200
2,049,900
kWh
|
- | - | - | - | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,870 | $84,875 |
$6,870
295,400
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $434,381 | $592,350 |
$96,315
4,896,880
kWh
|
$7,200
-
kW-mo/yr
|
$34,000 |
$41,025
-
MMBtu
|
$15,841
-
Tgal
|
$240,000 | ||
TOTAL IMPLEMENTED | $123,966 | $41,475 |
$60,800
2,691,800
kWh
|
$6,300
-
kW-mo/yr
|
- |
$41,025
-
MMBtu
|
$15,841
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs