ITAC Assessment: OR0422
ITAC logo
ITAC Assessment: OR0422
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product fruit juice and puree
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area
n/a
Annual Production 11,605,932
lb
Production Hrs. Annual 4,356
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,581 1,880,550
kWh
Electricity Demand $18,048 7,452
kW-mo/yr
Electricity Fees $11,096 -
Natural Gas $151,574 39,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,687

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $1,067 - $1,067
19,380
kWh
- -
02 2.2694: Use highest temperature for chilling or cold storage $4,106 $2,000 $3,842
69,761
kWh
$264
-
kW-mo/yr
-
03 2.2128: Use steam condensate for hot water supply (non-potable) $6,975 $5,500 - - $6,975
-
MMBtu
04 2.4133: Use most efficient type of electric motors $6,944 $2,953 $5,752
104,434
kWh
$1,192
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $595 - $522
9,455
kWh
$73
-
kW-mo/yr
-
TOTAL RECOMMENDED $19,687 $10,453 $11,183
203,030
kWh
$1,529
-
kW-mo/yr
$6,975
-
MMBtu
TOTAL IMPLEMENTED $19,687 $10,453 $11,183
203,030
kWh
$1,529
-
kW-mo/yr
$6,975
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs