ITAC Assessment: OR0409
ITAC logo
ITAC Assessment: OR0409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Precision Machine Parts
NAICS
n/a
SIC 3451: Screw Machine Products
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 47,000
ft2
Annual Production 40,000,000
pieces
Production Hrs. Annual 4,200
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,607 1,862,800
kWh
Electricity Demand $30,352 6,240
kW-mo/yr
Electricity Fees $1,339 -
Natural Gas $15,190 1,618
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,930 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,897

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,115 $33,646 $9,869
167,736
kWh
$2,306
-
kW-mo/yr
$(-452.0) $2,392
02 2.7111: Reduce illumination to minimum necessary levels $2,918 $3,031 $2,081
35,359
kWh
$486
-
kW-mo/yr
$(-34.0) $385
03 2.4133: Use most efficient type of electric motors $4,676 $560 $3,775
64,152
kWh
$901
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,472 $3,500 $2,547
43,293
kWh
$925
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,749 - $1,239
21,051
kWh
$510
-
kW-mo/yr
- -
TOTAL RECOMMENDED $26,930 $40,737 $19,511
331,591
kWh
$5,128
-
kW-mo/yr
$(-486.0) $2,777
TOTAL IMPLEMENTED $9,897 $4,060 $7,561
128,496
kWh
$2,336
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs