| Assessment Year | 1996 |
|---|---|
| Principal Product | anodized aluminum truck parts |
| NAICS |
n/a
|
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 400 |
| Plant Area |
85,000
ft2
|
| Annual Production | 10,500,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $291,669 | 9,038,687 |
kWh
|
$0.032 |
| Electricity Demand | $56,842 | 22,920 |
kW-mo/yr
|
$2.48 |
| Electricity Fees | $3,547 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $153,794 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $65,336 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.6112: Use filter and drying oven to reduce sludge volume | $61,134 | $20,900 |
$(-440.0)
(-13,482)
kWh
|
$(-96.0)
-
kW-mo/yr
|
- | - |
$35,300
-
lb
|
$26,370 | - | |
| 02 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $69,830 | $183,000 |
$(-7,760.0)
(-236,811)
kWh
|
$(-1,410.0)
-
kW-mo/yr
|
- |
$84,000
-
Tgal
|
- | - | $(-5,000.0) | |
| 03 | 2.2511: Insulate bare equipment | $14,343 | $15,100 |
$14,343
437,573
kWh
|
- | - | - | - | - | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $4,202 | $7,023 |
$3,687
112,544
kWh
|
$515
-
kW-mo/yr
|
- | - | - | - | - | |
| 05 | 2.3212: Optimize plant power factor | $3,319 | $9,400 | - | - | $3,319 | - | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $966 | $3,352 |
$1,178
36,049
kWh
|
$147
-
kW-mo/yr
|
- | - | - | $21 | $(-380.0) | |
| TOTAL RECOMMENDED | $153,794 | $238,775 |
$11,008
335,873
kWh
|
$(-844.0)
-
kW-mo/yr
|
$3,319 |
$84,000
-
Tgal
|
$35,300
-
lb
|
$26,391 | $(-5,380.0) | ||
| TOTAL IMPLEMENTED | $65,336 | $27,923 |
$3,247
99,062
kWh
|
$419
-
kW-mo/yr
|
- | - |
$35,300
-
lb
|
$26,370 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs