ITAC Assessment: OR0263
ITAC logo
ITAC Assessment: OR0263
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product anodized aluminum truck parts
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 400
Plant Area 85,000
ft2
Annual Production 10,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,669 9,038,687
kWh
Electricity Demand $56,842 22,920
kW-mo/yr
Electricity Fees $3,547 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $153,794 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,336

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.6112: Use filter and drying oven to reduce sludge volume $61,134 $20,900 $(-440.0)
(-13,482)
kWh
$(-96.0)
-
kW-mo/yr
- - $35,300
-
lb
$26,370 -
02 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $69,830 $183,000 $(-7,760.0)
(-236,811)
kWh
$(-1,410.0)
-
kW-mo/yr
- $84,000
-
Tgal
- - $(-5,000.0)
03 2.2511: Insulate bare equipment $14,343 $15,100 $14,343
437,573
kWh
- - - - - -
04 2.4133: Use most efficient type of electric motors $4,202 $7,023 $3,687
112,544
kWh
$515
-
kW-mo/yr
- - - - -
05 2.3212: Optimize plant power factor $3,319 $9,400 - - $3,319 - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $966 $3,352 $1,178
36,049
kWh
$147
-
kW-mo/yr
- - - $21 $(-380.0)
TOTAL RECOMMENDED $153,794 $238,775 $11,008
335,873
kWh
$(-844.0)
-
kW-mo/yr
$3,319 $84,000
-
Tgal
$35,300
-
lb
$26,391 $(-5,380.0)
TOTAL IMPLEMENTED $65,336 $27,923 $3,247
99,062
kWh
$419
-
kW-mo/yr
- - $35,300
-
lb
$26,370 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs