ITAC Assessment: OR0253
ITAC logo
ITAC Assessment: OR0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plywood
NAICS
n/a
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area 21,000
ft2
Annual Production 125,000
thousand feet
Production Hrs. Annual 7,056
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $496,624 13,695,487
kWh
Natural Gas $189,238 115,950
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,608 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3212: Optimize plant power factor $29,097 $26,200 $29,097
-
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,790 $5,000 $2,790
92,907
kWh
03 2.6212: Turn off equipment during breaks, reduce operating time $11,142 - $11,142
338,218
kWh
04 2.4133: Use most efficient type of electric motors $1,009 $2,543 $1,009
28,429
kWh
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,570 $35,000 $10,570
383,060
kWh
TOTAL RECOMMENDED $54,608 $68,743 $54,608
842,614
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs