Assessment Year | 1995 |
---|---|
Principal Product | Carbonated Beverages |
NAICS |
n/a
|
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
50,000
ft2
|
Annual Production | 450,000,000
lb
|
Production Hrs. Annual | 6,018
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $184,155 | 5,053,634 |
kWh
|
$0.036 |
Natural Gas | $68,629 | 14,008 |
MMBtu
|
$4.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,299 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,043 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.1161: Eliminate/reduce an operation | $4,425 | $300 | - | - |
$4,425
-
gal
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $18,578 | $4,500 |
$18,578
625,733
kWh
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $12,318 | $17,000 |
$(-2,080.0)
(-69,168)
kWh
|
$14,398
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,311 | $138 |
$1,292
39,273
kWh
|
- | - | $19 | |
05 | 2.4133: Use most efficient type of electric motors | $3,043 | $11,076 |
$3,043
84,115
kWh
|
- | - | - | |
06 | 2.3212: Optimize plant power factor | $1,624 | $5,100 |
$1,624
-
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $41,299 | $38,114 |
$22,457
679,953
kWh
|
$14,398
-
MMBtu
|
$4,425
-
gal
|
$19 | ||
TOTAL IMPLEMENTED | $3,043 | $11,076 |
$3,043
84,115
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs