| Assessment Year | 1995 |
|---|---|
| Principal Product | Carbonated Beverages |
| NAICS |
n/a
|
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $10 M to 50M |
| # of Employees | 45 |
| Plant Area |
50,000
ft2
|
| Annual Production | 450,000,000
lb
|
| Production Hrs. Annual | 6,018
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $184,155 | 5,053,634 |
kWh
|
$0.036 |
| Natural Gas | $68,629 | 14,008 |
MMBtu
|
$4.90 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $41,299 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,043 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.1161: Eliminate/reduce an operation | $4,425 | $300 | - | - |
$4,425
-
gal
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $18,578 | $4,500 |
$18,578
625,733
kWh
|
- | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $12,318 | $17,000 |
$(-2,080.0)
(-69,168)
kWh
|
$14,398
-
MMBtu
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,311 | $138 |
$1,292
39,273
kWh
|
- | - | $19 | |
| 05 | 2.4133: Use most efficient type of electric motors | $3,043 | $11,076 |
$3,043
84,115
kWh
|
- | - | - | |
| 06 | 2.3212: Optimize plant power factor | $1,624 | $5,100 |
$1,624
-
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $41,299 | $38,114 |
$22,457
679,953
kWh
|
$14,398
-
MMBtu
|
$4,425
-
gal
|
$19 | ||
| TOTAL IMPLEMENTED | $3,043 | $11,076 |
$3,043
84,115
kWh
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs