ITAC Assessment: OR0229
ITAC logo
ITAC Assessment: OR0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Galvanized Metals
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 45,000
ft2
Annual Production 18,321,000
lb
Production Hrs. Annual 6,257
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,028 6,105,803
kWh
Natural Gas $24,264 4,662
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,967 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,373

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings
01 2.2511: Insulate bare equipment $1,955 $445 $1,955
51,876
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,010 $2,000 $1,010
32,825
kWh
- -
03 2.4133: Use most efficient type of electric motors $85 $269 $85
2,345
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $37,639 $13,819 $78,482
2,234,467
kWh
$(-40,843.0)
-
MMBtu
-
05 3.1191: Change procedures / equipment / operating conditions $42,278 $66,500 $3,468
115,475
kWh
- $38,810
-
lb
TOTAL RECOMMENDED $82,967 $83,033 $85,000
2,436,988
kWh
$(-40,843.0)
-
MMBtu
$38,810
-
lb
TOTAL IMPLEMENTED $43,373 $68,769 $4,563
150,645
kWh
- $38,810
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs