Assessment Year | 1995 |
---|---|
Principal Product | Galvanized Metals |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
45,000
ft2
|
Annual Production | 18,321,000
lb
|
Production Hrs. Annual | 6,257
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $200,028 | 6,105,803 |
kWh
|
$0.033 |
Natural Gas | $24,264 | 4,662 |
MMBtu
|
$5.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $82,967 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,373 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $1,955 | $445 |
$1,955
51,876
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,010 | $2,000 |
$1,010
32,825
kWh
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $85 | $269 |
$85
2,345
kWh
|
- | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $37,639 | $13,819 |
$78,482
2,234,467
kWh
|
$(-40,843.0)
-
MMBtu
|
- | |
05 | 3.1191: Change procedures / equipment / operating conditions | $42,278 | $66,500 |
$3,468
115,475
kWh
|
- |
$38,810
-
lb
|
|
TOTAL RECOMMENDED | $82,967 | $83,033 |
$85,000
2,436,988
kWh
|
$(-40,843.0)
-
MMBtu
|
$38,810
-
lb
|
||
TOTAL IMPLEMENTED | $43,373 | $68,769 |
$4,563
150,645
kWh
|
- |
$38,810
-
lb
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs