Assessment Year | 1994 |
---|---|
Principal Product | Particle Board |
NAICS |
n/a
|
SIC | 2493: Reconstituted Wood Products |
Sales Range | $1 M to 5M |
# of Employees | 235 |
Plant Area |
n/a
|
Annual Production | 22,800,000
thousand feet
|
Production Hrs. Annual | 8,424
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,354,732 | 62,922,334 |
kWh
|
$0.037 |
Natural Gas | $602,810 | 462,781 |
MMBtu
|
$1.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $149,540 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $94,771 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.1232: Keep boiler tubes clean | $28,735 | $12,000 | - |
$28,735
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $520 | $642 |
$520
15,240
kWh
|
- | - | |
03 | 2.2136: Install / repair insulation on steam lines | $1,319 | $2,799 | - |
$1,319
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,036 | $10,000 |
$10,036
276,377
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $8,880 | $24,217 |
$8,880
237,104
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $44,050 | $157,100 |
$44,050
1,183,470
kWh
|
- | - | |
07 | 3.4111: Use closed cycle process to minimize waste water production | $56,000 | $10,000 | - | - |
$56,000
-
Tgal
|
|
TOTAL RECOMMENDED | $149,540 | $216,758 |
$63,486
1,712,191
kWh
|
$30,054
-
MMBtu
|
$56,000
-
Tgal
|
||
TOTAL IMPLEMENTED | $94,771 | $32,000 |
$10,036
276,377
kWh
|
$28,735
-
MMBtu
|
$56,000
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs