ITAC Assessment: OR0220
ITAC logo
ITAC Assessment: OR0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Particle Board
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $1
M
to 5
M
# of Employees 235
Plant Area
n/a
Annual Production 22,800,000
thousand feet
Production Hrs. Annual 8,424
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,354,732 62,922,334
kWh
Natural Gas $602,810 462,781
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $149,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,771

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.1232: Keep boiler tubes clean $28,735 $12,000 - $28,735
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $520 $642 $520
15,240
kWh
- -
03 2.2136: Install / repair insulation on steam lines $1,319 $2,799 - $1,319
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,036 $10,000 $10,036
276,377
kWh
- -
05 2.4133: Use most efficient type of electric motors $8,880 $24,217 $8,880
237,104
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $44,050 $157,100 $44,050
1,183,470
kWh
- -
07 3.4111: Use closed cycle process to minimize waste water production $56,000 $10,000 - - $56,000
-
Tgal
TOTAL RECOMMENDED $149,540 $216,758 $63,486
1,712,191
kWh
$30,054
-
MMBtu
$56,000
-
Tgal
TOTAL IMPLEMENTED $94,771 $32,000 $10,036
276,377
kWh
$28,735
-
MMBtu
$56,000
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs