ITAC Assessment: OR0109
ITAC logo
ITAC Assessment: OR0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product TREATED LUMBER & PLYWOOD
NAICS
n/a
SIC 2491: Wood Preserving
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area
n/a
Annual Production 72
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,198 1,325,615
kWh
Natural Gas $64,766 15,562
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,784 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $1,432 $1,506 - $1,432
-
MMBtu
02 2.2122: Install / repair insulation on condensate lines $1,381 $1,831 - $1,381
-
MMBtu
03 2.3212: Optimize plant power factor $2,806 $3,900 $2,806
-
kWh
-
04 2.4133: Use most efficient type of electric motors $165 $331 $165
5,862
kWh
-
TOTAL RECOMMENDED $5,784 $7,568 $2,971
5,862
kWh
$2,813
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs