Assessment Year | 1987 |
---|---|
Principal Product | LUMBER |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
n/a
|
Annual Production | 1,320,000
thousand feet
|
Production Hrs. Annual | 4,576
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $330,922 | 6,961,899 |
kWh
|
$0.048 |
Fuel Oil #2 | $293,072 | 73,920 |
MMBtu
|
$3.96 |
Wood | $207,914 | 358,474 |
MMBtu
|
$0.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $410,617 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $408,805 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $33,410 | $300 | - |
$19,377
-
MMBtu
|
$14,033
-
MMBtu
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,812 | - |
$1,812
38,101
kWh
|
- | - | - | |
03 | 2.2121: Increase amount of condensate returned | $31,778 | $2,900 | - |
$18,529
-
MMBtu
|
$13,249
-
MMBtu
|
- | |
04 | 2.3212: Optimize plant power factor | $28,881 | $11,000 |
$28,881
-
kWh
|
- | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $269 | $261 |
$269
5,569
kWh
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,307 | $36,869 |
$12,307
473,329
kWh
|
- | - | - | |
07 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $302,160 | $3,750,000 |
$306,321
6,444,900
kWh
|
- |
$(-54,280.0)
-
MMBtu
|
$50,119 | |
TOTAL RECOMMENDED | $410,617 | $3,801,330 |
$349,590
6,961,899
kWh
|
$37,906
-
MMBtu
|
$(-26,998.0)
-
MMBtu
|
$50,119 | ||
TOTAL IMPLEMENTED | $408,805 | $3,801,330 |
$347,778
6,923,798
kWh
|
$37,906
-
MMBtu
|
$(-26,998.0)
-
MMBtu
|
$50,119 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs