ITAC Assessment: OK0730
ITAC logo
ITAC Assessment: OK0730
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Ferrous Castings
NAICS 331512: Steel Investment Foundries
SIC 3324: Steel Investment Foundries
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 30,000
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 2,860
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,645 2,262,600
kWh
Natural Gas $98,463 10,403
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,069

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $26,839 $1,000 - $26,839 -
02 2.7221: Lower temperature during the winter season and vice-versa $1,500 $1,237 - - $1,500
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,533 $3,500 $5,533
74,675
kWh
- -
04 2.7135: Install occupancy sensors $948 $158 $948
12,790
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $150 $767 $150
1,883
kWh
- -
06 2.2437: Recover waste heat from equipment $1,565 $8,601 - - $1,565
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,886 $1,767 $3,886
55,132
kWh
- -
TOTAL RECOMMENDED $40,421 $17,030 $10,517
144,480
kWh
$26,839 $3,065
-
MMBtu
TOTAL IMPLEMENTED $11,069 $7,271 $9,569
131,690
kWh
- $1,500
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs