| Assessment Year | 2006 |
|---|---|
| Principal Product | Ferrous Castings |
| NAICS | 331512: Steel Investment Foundries |
| SIC | 3324: Steel Investment Foundries |
| Sales Range | $1 M to 5M |
| # of Employees | 30 |
| Plant Area |
30,000
ft2
|
| Annual Production | 1,500,000
lb
|
| Production Hrs. Annual | 2,860
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $167,645 | 2,262,600 |
kWh
|
$0.074 |
| Natural Gas | $98,463 | 10,403 |
MMBtu
|
$9.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,421 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,069 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $26,839 | $1,000 | - | $26,839 | - | |
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $1,500 | $1,237 | - | - |
$1,500
-
MMBtu
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,533 | $3,500 |
$5,533
74,675
kWh
|
- | - | |
| 04 | 2.7135: Install occupancy sensors | $948 | $158 |
$948
12,790
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $150 | $767 |
$150
1,883
kWh
|
- | - | |
| 06 | 2.2437: Recover waste heat from equipment | $1,565 | $8,601 | - | - |
$1,565
-
MMBtu
|
|
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,886 | $1,767 |
$3,886
55,132
kWh
|
- | - | |
| TOTAL RECOMMENDED | $40,421 | $17,030 |
$10,517
144,480
kWh
|
$26,839 |
$3,065
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,069 | $7,271 |
$9,569
131,690
kWh
|
- |
$1,500
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs