ITAC Assessment: OK0705
ITAC logo
ITAC Assessment: OK0705
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Plastic Sheeting
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area 48,000
ft2
Annual Production 52,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,750 12,844,000
kWh
Electricity Demand $208,640 20,561
kW-mo/yr
Electricity Fees $(-14,796.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,953 $32,150 $19,953
612,064
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $978 $6,015 $978
30,000
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,199 $1,007 $4,533
278,100
kWh
$3,866
-
kW-mo/yr
$(-200.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,908 $4,618 $2,109
129,392
kWh
$1,799
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $16,153 $14,047 $8,718
534,877
kWh
$7,435
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $199 $302 $21
1,282
kWh
$18
-
kW-mo/yr
$160
07 2.7142: Utilize higher efficiency lamps and/or ballasts $842 $6,783 $418
25,643
kWh
$424
-
kW-mo/yr
-
08 2.4133: Use most efficient type of electric motors $5,062 $50,389 $945
57,975
kWh
- $4,117
TOTAL RECOMMENDED $55,294 $115,311 $37,675
1,669,333
kWh
$13,542
-
kW-mo/yr
$4,077
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs