| Assessment Year | 2000 |
|---|---|
| Principal Product | Structural Steel |
| NAICS |
n/a
|
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
55,000
ft2
|
| Annual Production | 6,480
ton
|
| Production Hrs. Annual | 2,720
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $36,842 | 542,204 |
kWh
|
$0.068 |
| Electricity Demand | $37,526 | 9,168 |
kW-mo/yr
|
$4.09 |
| Electricity Fees | $685 | - |
|
- |
| Natural Gas | $10,075 | 2,194 |
MMBtu
|
$4.59 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,504 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,635 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 4.111: Add equipment/ operators to reduce production bottleneck | $17,680 | $250 | - | - | $17,680 | |
| 02 | 4.111: Add equipment/ operators to reduce production bottleneck | $5,824 | $3,443 | - | - | $5,824 | |
| 03 | 3.6124: Burn waste oil for heat | $2,892 | $3,490 | - |
$2,892
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,604 | $5,081 |
$2,604
34,877
kWh
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $2,743 | $1,613 |
$2,743
40,445
kWh
|
- | - | |
| 06 | 2.7135: Install occupancy sensors | $761 | $1,440 |
$761
11,137
kWh
|
- | - | |
| TOTAL RECOMMENDED | $32,504 | $15,317 |
$6,108
86,459
kWh
|
$2,892
-
MMBtu
|
$23,504 | ||
| TOTAL IMPLEMENTED | $5,635 | $5,103 |
$2,743
40,445
kWh
|
$2,892
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs