ITAC Assessment: OK0589
ITAC logo
ITAC Assessment: OK0589
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Steel Pipe
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 23,000
ft2
Annual Production 5,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,173 1,697,831
kWh
Electricity Demand $66,880 -
Electricity Fees $384 -
Natural Gas $46,920 19,610
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,733 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,733

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,862 $1,900 $2,848
136,870
kWh
$5,014
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,093 $4,942 $1,336
36,635
kWh
$757
-
kW-mo/yr
- -
03 2.7134: Use photocell controls $504 $136 $240
6,448
kWh
$264
-
kW-mo/yr
- -
04 4.652: Replace existing equipment with more suitable substitutes $72,000 $230,000 - - - $72,000
05 3.5311: Recover and reuse waste material $20,274 $59,400 - - $20,274
-
lb
-
TOTAL RECOMMENDED $102,733 $296,378 $4,424
179,953
kWh
$6,035
-
kW-mo/yr
$20,274
-
lb
$72,000
TOTAL IMPLEMENTED $102,733 $296,378 $4,424
179,953
kWh
$6,035
-
kW-mo/yr
$20,274
-
lb
$72,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs