ITAC Assessment: OK0556
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Edible Oils
NAICS
n/a
SIC 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 73
Plant Area 400,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,480 8,810,375
kWh
Electricity Demand $161,320 2,233
kW-mo/yr
Electricity Fees $1,676 -
Natural Gas $675,453 250,333
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $204,826 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,889

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.1231: Establish burner maintenance schedule for boilers $75,726 $9,000 - - $75,726
-
MMBtu
- -
02 2.2136: Install / repair insulation on steam lines $227 $678 - - $227
-
MMBtu
- -
03 2.2135: Repair and eliminate steam leaks $1,303 $500 $1,303
49,238
kWh
- - - -
04 3.4155: Meter waste water $119,889 - - - - $119,889
-
Tgal
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $6,048 $3,000 $3,736
141,559
kWh
$2,312
-
kW-mo/yr
- - -
06 2.7111: Reduce illumination to minimum necessary levels $633 $1,020 $633
24,033
kWh
- - - -
07 3.6122: Install solid waste incinerator for heat $1,000 - - - - - $1,000
-
lb
TOTAL RECOMMENDED $204,826 $14,198 $5,672
214,830
kWh
$2,312
-
kW-mo/yr
$75,953
-
MMBtu
$119,889
-
Tgal
$1,000
-
lb
TOTAL IMPLEMENTED $78,889 $11,198 $1,936
73,271
kWh
- $75,953
-
MMBtu
- $1,000
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs