Assessment Year | 1996 |
---|---|
Principal Product | Refurbished jet engine parts and manufacturing new engines |
NAICS |
n/a
|
SIC | 3721: Aircraft |
Sales Range | $10 M to 50M |
# of Employees | 690 |
Plant Area |
703,000
ft2
|
Annual Production | 800
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $920,195 | 21,164,420 |
kWh
|
$0.043 |
Electricity Demand | $489,693 | 47,031 |
kW-mo/yr
|
$10.41 |
Natural Gas | $188,893 | 41,582 |
MMBtu
|
$4.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,166 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,397 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,692 | $3,200 | - | - |
$2,692
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,469 | $1,648 |
$1,294
12,309
kWh
|
$175
-
kW-mo/yr
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $4,649 | $1,399 | - | - |
$4,649
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,295 | $4,770 |
$1,657
38,101
kWh
|
$638
-
kW-mo/yr
|
- | - | |
05 | 2.7135: Install occupancy sensors | $120 | $366 |
$120
2,638
kWh
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,199 | $23,287 |
$12,421
286,342
kWh
|
$4,778
-
kW-mo/yr
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,160 | $4,844 |
$1,560
36,049
kWh
|
$600
-
kW-mo/yr
|
- | - | |
08 | 3.8142: Distill contaminated solvents for reuse | $21,582 | $4,500 | - | - | - |
$21,582
-
gal
|
|
TOTAL RECOMMENDED | $52,166 | $44,014 |
$17,052
375,439
kWh
|
$6,191
-
kW-mo/yr
|
$7,341
-
MMBtu
|
$21,582
-
gal
|
||
TOTAL IMPLEMENTED | $47,397 | $42,249 |
$16,932
372,801
kWh
|
$6,191
-
kW-mo/yr
|
$2,692
-
MMBtu
|
$21,582
-
gal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs