ITAC Assessment: OK0458
ITAC logo
ITAC Assessment: OK0458
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Orthopedic bandages
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 33,500
ft2
Annual Production 18,720
thousand feet
Production Hrs. Annual 3,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,468 1,364,889
kWh
Natural Gas $20,889 6,408
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,062 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $616 $3,962 $616
12,016
kWh
-
02 2.7135: Install occupancy sensors $662 $760 $662
13,775
kWh
-
03 2.2437: Recover waste heat from equipment $633 $727 - $633
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,010 $170 $1,010
24,326
kWh
-
05 2.4322: Use or replace with energy efficient substitutes $60 $108 $60
1,172
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,081 $10,307 $2,081
30,188
kWh
-
TOTAL RECOMMENDED $5,062 $16,034 $4,429
81,477
kWh
$633
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs