Assessment Year | 1993 |
---|---|
Principal Product | Tubular Goods |
NAICS |
n/a
|
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 98 |
Plant Area |
n/a
|
Annual Production | 44,607
ton
|
Production Hrs. Annual | 3,432
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $359,829 | 6,069,461 |
kWh
|
$0.059 |
Natural Gas | $444,829 | 168,042 |
MMBtu
|
$2.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,281 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,517 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,868 | - |
$10,868
367,526
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,357 | $4,918 |
$6,357
121,043
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $4,487 | $11,785 |
$4,487
79,719
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,725 | $3,693 |
$1,725
37,808
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $948 | $1,079 |
$948
20,809
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $612 | $749 |
$612
10,844
kWh
|
- | |
07 | 2.1116: Improve combustion control capability | $40,284 | $190,000 | - |
$40,284
-
MMBtu
|
|
TOTAL RECOMMENDED | $65,281 | $212,224 |
$24,997
637,749
kWh
|
$40,284
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,517 | $21,475 |
$13,517
259,379
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs