ITAC Assessment: OK0402
ITAC logo
ITAC Assessment: OK0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Natural Gas Compressors Packaging and Refurbishing
NAICS
n/a
SIC 3563: Air and Gas Compressors
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 52,000
ft2
Annual Production 135
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,486 818,581
kWh
Natural Gas $14,996 3,594
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,415 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,566

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,751 $4,508 $1,751
14,068
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,470 $18,084 $5,470
43,962
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $815 $1,100 $815
4,982
kWh
-
04 2.2437: Recover waste heat from equipment $379 $438 - $379
-
MMBtu
TOTAL RECOMMENDED $8,415 $24,130 $8,036
63,012
kWh
$379
-
MMBtu
TOTAL IMPLEMENTED $2,566 $5,608 $2,566
19,050
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs