ITAC Assessment: OK0338
ITAC logo
ITAC Assessment: OK0338
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product POWER CABLE
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 16
thousand feet
Production Hrs. Annual 5,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $256,169 4,745,897
kWh
Natural Gas $26,610 9,242
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,169 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,169

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $12,997 $600 $12,997
225,967
kWh
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $56,160 - $56,160
-
kWh
- -
03 2.2135: Repair and eliminate steam leaks $3,777 - - $3,827
-
MMBtu
$(-50.0)
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,871 - $2,008
10,551
kWh
$(-137.0)
-
MMBtu
-
05 2.2123: Insulate feedwater tank $364 $487 - $364
-
MMBtu
-
TOTAL RECOMMENDED $75,169 $1,087 $71,165
236,518
kWh
$4,054
-
MMBtu
$(-50.0)
TOTAL IMPLEMENTED $75,169 $1,087 $71,165
236,518
kWh
$4,054
-
MMBtu
$(-50.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs