Assessment Year | 1989 |
---|---|
Principal Product | BREAD AND BUNS |
NAICS |
n/a
|
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 109 |
Plant Area |
n/a
|
Annual Production | 40,700,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $185,275 | 2,645,076 |
kWh
|
$0.070 |
Natural Gas | $146,050 | 33,175 |
MMBtu
|
$4.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,997 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,997 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $2,730 | $818 | - |
$2,730
-
MMBtu
|
|
02 | 2.2441: Preheat boiler makeup water with waste process heat | $3,202 | $7,214 |
$(-55.0)
(-1,172)
kWh
|
$3,257
-
MMBtu
|
|
03 | 2.2443: Re-use or recycle hot or cold process exhaust air | $5,053 | $8,840 |
$(-265.0)
(-5,275)
kWh
|
$5,318
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $555 | $1,500 | - |
$555
-
MMBtu
|
|
05 | 2.4133: Use most efficient type of electric motors | $277 | $229 |
$277
3,224
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,180 | $7,140 |
$4,180
47,479
kWh
|
- | |
TOTAL RECOMMENDED | $15,997 | $25,741 |
$4,137
44,256
kWh
|
$11,860
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,997 | $25,741 |
$4,137
44,256
kWh
|
$11,860
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs