ITAC Assessment: OK0294
ITAC logo
ITAC Assessment: OK0294
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product BREAD AND BUNS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 109
Plant Area
n/a
Annual Production 40,700,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,275 2,645,076
kWh
Natural Gas $146,050 33,175
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,997

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $2,730 $818 - $2,730
-
MMBtu
02 2.2441: Preheat boiler makeup water with waste process heat $3,202 $7,214 $(-55.0)
(-1,172)
kWh
$3,257
-
MMBtu
03 2.2443: Re-use or recycle hot or cold process exhaust air $5,053 $8,840 $(-265.0)
(-5,275)
kWh
$5,318
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $555 $1,500 - $555
-
MMBtu
05 2.4133: Use most efficient type of electric motors $277 $229 $277
3,224
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,180 $7,140 $4,180
47,479
kWh
-
TOTAL RECOMMENDED $15,997 $25,741 $4,137
44,256
kWh
$11,860
-
MMBtu
TOTAL IMPLEMENTED $15,997 $25,741 $4,137
44,256
kWh
$11,860
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs