ITAC Assessment: OK0266
ITAC logo
ITAC Assessment: OK0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product COMMERCIAL FEED
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 200,000
ton
Production Hrs. Annual 7,300
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,411 3,241,794
kWh
Natural Gas $67,127 24,157
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,245 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,021

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3511: Use plant owned transformers or lease transformers $15,319 $37,200 $15,319
-
kWh
-
02 2.3212: Optimize plant power factor $1,083 $1,075 $1,083
-
kWh
-
03 2.4133: Use most efficient type of electric motors $162 $329 $162
4,689
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $693 $945 $693
26,964
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,764 $7,051 $2,764
82,649
kWh
-
06 2.2122: Install / repair insulation on condensate lines $224 $312 - $224
-
MMBtu
TOTAL RECOMMENDED $20,245 $46,912 $20,021
114,302
kWh
$224
-
MMBtu
TOTAL IMPLEMENTED $20,021 $46,600 $20,021
114,302
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs