ITAC Assessment: OK0027
ITAC logo
ITAC Assessment: OK0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product STAINLESS STEEL TUBING
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range n/a
# of Employees 45
Plant Area
n/a
Annual Production 450,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,434 400,352
kWh
Natural Gas $1,527 611
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $884 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $792 $108 $792
17,878
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $46 $42 $46
1,172
kWh
-
03 2.2437: Recover waste heat from equipment $46 $250 - $46
-
MMBtu
TOTAL RECOMMENDED $884 $400 $838
19,050
kWh
$46
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs