ITAC Assessment: OD0050
ITAC logo
ITAC Assessment: OD0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Ceramic Fiber Components (Refractory)
NAICS
n/a
SIC 3255: Clay Refractories
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 28,220
ft2
Annual Production 750,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,190 1,828,253
kWh
Electricity Demand $45,384 3,689
kW-mo/yr
Electricity Fees $7,379 -
Natural Gas $87,066 20,922
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,323 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,860

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $1,688 $1,588 $1,118
23,154
kWh
$570
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,460 $1,336 $715
30,188
kWh
$745
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,237 $14,200 $6,237
264,361
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $443 $240 $217
9,086
kWh
$226
-
kW-mo/yr
- -
05 2.3132: Recharge batteries on during off-peak demand periods $765 - - $765
-
kW-mo/yr
- -
06 2.6218: Turn off equipment when not in use $1,504 - - - $1,504
-
MMBtu
-
07 3.5311: Recover and reuse waste material $24,226 $1,072 - - - $24,226
-
lb
TOTAL RECOMMENDED $36,323 $18,436 $8,287
326,789
kWh
$2,306
-
kW-mo/yr
$1,504
-
MMBtu
$24,226
-
lb
TOTAL IMPLEMENTED $5,860 $3,164 $2,050
62,428
kWh
$2,306
-
kW-mo/yr
$1,504
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs