ITAC Assessment: NV0160
ITAC logo
ITAC Assessment: NV0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Asphalt
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 3
Plant Area 20,000
ft2
Annual Production 250,000
ton
Production Hrs. Annual 925
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,203 665,885
kWh
Electricity Demand $35,445 4,641
kW-mo/yr
Electricity Fees $5,190 -
Fuel Oil #2 $337,849 63,091
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $207,296 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Administrative Changes Savings Primary Product Savings
01 2.1114: Limit and control secondary combustion air in furnace $8,107 $370 n/a - - - $8,107
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,666 $240 n/a $6,810
152,989
kWh
$5,608
-
kW-mo/yr
$248 - - -
03 2.4133: Use most efficient type of electric motors $3,918 $8,274 n/a $1,172
26,377
kWh
$2,669
-
kW-mo/yr
$77 - - -
04 2.1321: Replace fossil fuel equipment with electrical equipment $4,907 $2,175 n/a - - - $4,907
-
MMBtu
- -
05 2.2511: Insulate bare equipment $880 $585 n/a - - - $880
-
MMBtu
- -
06 2.7132: Install timers on light switches in little used areas $1,742 $125 n/a $1,742
38,394
kWh
- - - - -
07 3.1171: Change product specs $5,112 - n/a - - - - $5,112 -
08 4.111: Add equipment/ operators to reduce production bottleneck $169,964 $15,000 n/a $1,967
43,962
kWh
- - - - $167,997
TOTAL RECOMMENDED $207,296 $26,769 $11,691
261,722
kWh
$8,277
-
kW-mo/yr
$325 $13,894
-
MMBtu
$5,112 $167,997
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs