Assessment Year | 2000 |
---|---|
Principal Product | Asphalt |
NAICS |
n/a
|
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $5 M to 10M |
# of Employees | 3 |
Plant Area |
20,000
ft2
|
Annual Production | 250,000
ton
|
Production Hrs. Annual | 925
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $32,203 | 665,885 |
kWh
|
$0.048 |
Electricity Demand | $35,445 | 4,641 |
kW-mo/yr
|
$7.64 |
Electricity Fees | $5,190 | - |
|
- |
Fuel Oil #2 | $337,849 | 63,091 |
MMBtu
|
$5.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $207,296 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1114: Limit and control secondary combustion air in furnace | $8,107 | $370 | n/a | - | - | - |
$8,107
-
MMBtu
|
- | - |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,666 | $240 | n/a |
$6,810
152,989
kWh
|
$5,608
-
kW-mo/yr
|
$248 | - | - | - |
03 | 2.4133: Use most efficient type of electric motors | $3,918 | $8,274 | n/a |
$1,172
26,377
kWh
|
$2,669
-
kW-mo/yr
|
$77 | - | - | - |
04 | 2.1321: Replace fossil fuel equipment with electrical equipment | $4,907 | $2,175 | n/a | - | - | - |
$4,907
-
MMBtu
|
- | - |
05 | 2.2511: Insulate bare equipment | $880 | $585 | n/a | - | - | - |
$880
-
MMBtu
|
- | - |
06 | 2.7132: Install timers on light switches in little used areas | $1,742 | $125 | n/a |
$1,742
38,394
kWh
|
- | - | - | - | - |
07 | 3.1171: Change product specs | $5,112 | - | n/a | - | - | - | - | $5,112 | - |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $169,964 | $15,000 | n/a |
$1,967
43,962
kWh
|
- | - | - | - | $167,997 |
TOTAL RECOMMENDED | $207,296 | $26,769 |
$11,691
261,722
kWh
|
$8,277
-
kW-mo/yr
|
$325 |
$13,894
-
MMBtu
|
$5,112 | $167,997 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs