ITAC Assessment: NV0150
ITAC logo
ITAC Assessment: NV0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Commercial Printing,Lithographic
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 38
Plant Area 7,200
ft2
Annual Production 5
ton
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,018 921,747
kWh
Electricity Demand $22,257 3,269
kW-mo/yr
Electricity Fees $7,330 -
LPG $2,116 158
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,791 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,986

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings
01 2.3212: Optimize plant power factor $1,583 - $649
11,430
kWh
- $934 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $357 $100 $229
3,810
kWh
$102
-
kW-mo/yr
$26 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $385 $3,344 $249
4,396
kWh
$56
-
kW-mo/yr
$80 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $359 $105 $289
3,810
kWh
$49
-
kW-mo/yr
$21 -
05 2.7241: Install outside air damper / economizer on hvac unit $13,222 $10,869 $9,767
166,764
kWh
$2,502
-
kW-mo/yr
$953 -
06 2.7243: Improve air circulation with destratification fans / other methods $885 $304 $49
879
kWh
$8
-
kW-mo/yr
$4 $824
-
MMBtu
TOTAL RECOMMENDED $16,791 $14,722 $11,232
191,089
kWh
$2,717
-
kW-mo/yr
$2,018 $824
-
MMBtu
TOTAL IMPLEMENTED $1,986 $3,853 $816
12,895
kWh
$215
-
kW-mo/yr
$131 $824
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs