Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Precision Sheet Metal Parts
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 53,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,713 3,593,494
kWh
Electricity Demand $28,880 3,112
kW-mo/yr
Electricity Fees $2,668 -
Natural Gas $43,573 8,356
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,034

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $768 $1,500 - - - $768
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,562 $22,374 $10,533
205,158
kWh
$5,909
-
kW-mo/yr
$120 - -
03 2.7243: Improve air circulation with destratification fans / other methods $1,341 $1,391 $117
(-2,931)
kWh
- $(-1.0) $1,225
-
MMBtu
-
04 3.6192: Use a less expensive method of waste removal $704 - - - - - $704
TOTAL RECOMMENDED $19,375 $25,265 $10,650
202,227
kWh
$5,909
-
kW-mo/yr
$119 $1,993
-
MMBtu
$704
TOTAL IMPLEMENTED $18,034 $23,874 $10,533
205,158
kWh
$5,909
-
kW-mo/yr
$120 $768
-
MMBtu
$704
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs